New England benchmarks
Midrange bath remodel
$27,559
New England average job cost
Cost vs. Value 2025 via Zillow · checked Oct 2026 · regional
Universal-design bath
$43,119
New England average job cost
Cost vs. Value 2025 · checked Oct 2026 · regional
Upscale bath remodel
$83,877
New England average job cost
Cost vs. Value 2025 · checked Oct 2026 · regional
The annual Cost vs. Value report from the Journal of Light Construction prices the same defined projects in each region. For 2025 in New England, Zillow's summary gives a midrange bath remodel at $27,559 on average, against $26,138 nationally. The upscale and universal-design figures come from the same report's New England table. The midrange project is a 5-by-7 bathroom with a new tub, ceramic tile surround, toilet, solid-surface vanity, lighting and tile floor. It's close to a typical Waterbury hall bath.
National ranges
Bathroom remodel
$6,648to$17,646
Typical professional remodel
Angi · checked Oct 2026 · national
Primary bathroom, 120 sq ft
$8,400to$30,000
Remodel range
Angi · checked Oct 2026 · national
Tub-to-shower conversion
$1,200to$8,000
Typical range, average about $3,000
Angi · checked Oct 2026 · national
Angi's bathroom remodel guide puts most professional bathroom remodels at $6,648 to $17,646. It also lists demolition alone at $1,000 to $2,300. Those lower national numbers include partial updates. A full gut remodel with tile and glass in a higher-cost region, in an older house or a newer one, comes in closer to the New England benchmarks.
A 1950s bathroom before a full remodelWhat moves a Waterbury price
- In older houses, plaster demolition and leveling settled floors add days. Newer houses with drywall and level floors skip most of that.
- Rotted subfloor or a cut joist is found only once the floor is open. We list an allowance for it in writing.
- Keeping the toilet, tub and sink where they are is the biggest single way to save.
- Small mosaics, marble and borders take more hours to set than large plain tile.
- Frameless glass is custom-measured after tile and priced by panel and hardware.
- A third-floor bath up a narrow triple-decker stair makes demolition and a cast-iron tub harder to move.
How we price
After a measuring visit, you get a written price that lists demolition, framing, plumbing, electrical, waterproofing, tile, glass, vanity and fixtures as separate lines, with start and finish dates. Swapping a finish later shows up as a change to one line, so you can see what each choice costs.